Most recent applications from Yarra City Council, VIC

65 Type St Richmond VIC 3121

Ground floor extension of a dwelling

14 days ago

55 Highett St Richmond VIC 3121

Construction of a pergola to the rear of an existing hotel (Kingston Hotel)

14 days ago

316 St Georges Rd Fitzroy North VIC 3068

Section 72 amendment to illuminate the previously approved sign from11:00AM to 11:00PM daily.

14 days ago

184 Lennox St Richmond VIC 3121

Amendment to include additional demolition works and construction on the existing dwelling, including the demolition and construction of the front fence.

14 days ago

17 Docker St Richmond VIC 3121

Please see attached cover letter for propsoed amendments to the endorsed plans

14 days ago

3/135 Coppin St Richmond VIC 3121

S72 Amendment to the endorsed plans comprising of alterations to Apartment 3 to increase the number of bedrooms within the dwelling

14 days ago

364 Church St Richmond VIC 3121

Replacement of Existing Smoke Detectors to Heat Detectors in dining room & kitchen

16 days ago

Floor 1 to Fl 2 20-32 Fitzroy St Fitzroy VIC 3065

Former East Hill Hotel Ceiling Structure Rectification- St Vin. Rectification works - East Hill Hotel- 59-61 & 75 Fitzroy St & 20 Fitzroy Street, Fitzroy

16 days ago

340 St Georges Rd Fitzroy North VIC 3068

Construct and display signage

16 days ago

128-144 Wellington St Collingwood VIC 3066

Display of signs: • To erect and display a Business Identification Sign. • To erect and display an Internally Illuminated Sign. • To erect and display a high wall sign.

16 days ago

148 Miller St Fitzroy North VIC 3068

Partial demolition and extension of a dwelling

16 days ago

792 Drummond St Carlton North VIC 3054

Demolish and construct a front fence

16 days ago

9 Fenwick St Clifton Hill VIC 3068

Amendments to endorsed plans

16 days ago

18 Otto Pl Richmond VIC 3121

Changes to ground floor: :garage door placement to boundary, Front entrance change, window change in garage, split level floor in studio to be replaced to single level, extra window on east side in studio, bathroom relocated to east side of building. Level 1 changes: north front balcony to be increased in size and lounge room decreased, kitchen configuration changed. Level 1 balcony on east side a slight change configurations of stairs Level 2 changes: extra high window included on east side of bed 2 and change internal wall to increase bedroom size

16 days ago

137-141 Johnston St Fitzroy VIC 3065

Amendment

16 days ago

9-13 Stewart St Richmond VIC 3121

Proposed Fitout - Level 2

18 days ago

353 Station St Carlton North VIC 3054

Alterations and additions to a dwelling.

18 days ago

4-6 Derby St Collingwood VIC 3066

Proposed Construction of Multi Unit Residential Development

18 days ago

164 Richardson St Carlton North VIC 3054

Demolition, dwelling additions to the rear of the dwelling, and construction of a pergola

18 days ago

3 Hargreaves St Fitzroy VIC 3065

External alterations to the building involving the addition of window grids

18 days ago

106 Lennox St Richmond VIC 3121

Demolition and external alterations including roof replacement, skylight replacement, and changes to window and doors.

18 days ago

135-137 Brunswick St Fitzroy VIC 3065

Alterations and Additions to Existing Building Including Change of Use

19 days ago

141-147 Queens Pde Clifton Hill VIC 3068

Internal alterations to an existing Metro - Front of Store

19 days ago

510 Church St Cremorne VIC 3121

Alterations to an Existing Office- Level 2

19 days ago

20 Stawell St Richmond VIC 3121

Partial restumping to an existing dwelling

19 days ago

11 Cotter St Richmond VIC 3121

Alterations to an existing Dwelling (repair of subfloor) Alterations Subfloor Restump & Reframe

19 days ago

22 William St Abbotsford VIC 3067

Underpinning of a Dwelling

19 days ago

59 Barkly St Fitzroy North VIC 3068

Restump to an Existing Dwelling

19 days ago

1 Burrung Lane Fitzroy VIC 3065

Partial Demolition Extension & Alteration to existing Dwelling - Stage 1

19 days ago

32 Wellington St Cremorne VIC 3121

Completion of Garage & First Floor Studio- Stage 2

19 days ago