Most recent applications from NSW Sydney and Regional Planning Panels, NSW
460 Atkins Street South Albury 2640, NSW
Child Care Facility, Signage, Carparking, Vegetation Removal & Demolition of Dwelling
11 days ago
2/Dp1324684, NSW
Concept DA and Stage 1 of 4 of an eco-tourist facility and community title subdivision, Stage 1 being erection of six (6) tourist cottages and one (1) manager’s residence, and six-lot community title subdivision
14 days ago
254 Wollombi Road Bellbird Heights 2325,268 Wollombi Road Bellbird 2325,Mount View Road Cessnock 2325, NSW
Torrens Title Subdivision (Four (4) into 473 Lots) over 10 Stages with Associated Earthworks, Civil and Drainage Works
14 days ago
Caswell Street Coonamble 2829, NSW
Coonamble Artesian Bore Baths, Caravan Park & Amenities & Facilities
14 days ago
174 Johnston Street North Tamworth 2340,178 Johnston Street North Tamworth 2340,Johnston Street North Tamworth 2340, NSW
Mixed use development, comprising serviced apartments, cafe, health services facility and ancillary development
20 days ago
4920 Noorong Road Tullakool 2732, NSW
Expand the existing Lytton Sand Quarry to access additional high-quality sand reserves directly adjoining the current extraction area. The expansion will extend the approved extraction footprint, continue shallow below-ground sand extraction and screening activities, and implement staged rehabilitation consistent with existing practice allowing a maximum annual extraction volume of 100,000t.
26 days ago
1415 Bundella Road Quirindi 2343,1553 Bundella Road Quirindi 2343, NSW
Establishment of a 4.99MW Solar PV Electricity Generation Works with Associated Infrastructure (Battery Energy Storage System)
26 days ago
5 Treelands Drive Yamba 2464, NSW
Demolition of the existing Church, construction of a new Church building, reconfigure site access and car parking and associated landscaping
26 days ago
91 Northern Distributor Road Orange 2800, NSW
Site clearing, bulk earthworks and construction of 46 multi-dwelling housing units comprising 20 x 3-bedroom units and 26 x 4-bedroom units, associated site improvements including landscaping and parking, and road intersection upgrades.
26 days ago
43 Noorong Street Barham 2732,41 Noorong Street Barham 2732, NSW
Construction of a new, purpose-built childcare centre providing 90 long day care places, including a boundary realignment required to accommodate the childcare centre on the northern allotment and a future commercial development on the southern allotment.
About 1 month ago
147 Addison Street Goulburn 2580, NSW
Demolition of existing building, construction of a four story educational establishment building containing general learning area, amenities block, related landscaping, retaining walls, footpaths, stairs and ramps.
About 1 month ago
675 Birkalla Road Bungaba 2852, NSW
Proposed expansion and formalisation of gravel quarry with an extraction rate of 100,000 tonnes per annum.
About 1 month ago
Burgmanns Lane Kingswood 2340, NSW
Highway service centre, including a single storey service station, convenience store, dine-in restaurant, two separate drive-thru restaurants, truck and car wash, truck service centre and associated signage.
About 1 month ago
32 Crawford Road East Lismore 2480, NSW
Proposed Urban Subdivision and Concept Development Approval comprising: • Subdivision of the land into 2 x ‘super lots’, 19 x ‘standard’ residential lots, 1 x public reserve and 1 x residue lot; and • Concept approval for the development of SL1 & SL2 for medium density / terrace house style development. The super lots will each be subject to separate development approvals to enable the construction of housing and subsequent subdivision of the accommodation units; and • Associated road and infrastructure services, earthworks, vegetation management
About 1 month ago
Gwydir Highway Glen Innes 2370, NSW
Solar farm and battery energy storage system occupying 15 hectares with generating capacity of 4.96 megawatts off Gwydir Highway approximately 3km west of Glen Innes.
About 1 month ago
135 Wogamia Road Longreach 2540, NSW
Section 4.55(2) application to increase the current capacity of the facility to allow the receipt of a combined total of 130,000 tpa of material (including approved organics waste and VENM and drilling mud)
About 2 months ago
199 Forest Way Belrose 2085,Glenaeon Avenue Belrose 2085, NSW
Modification of Development Consent DA2018/1332 granted for Demolition works and construction of major additions to Glenaeon Retirement Village, including self contained dwellings and a new residential care facility on a neighbouring lot, with associated carparking, landscaping and public road modifications
About 2 months ago
22 Short Street Mudgee 2850, NSW
Alterations to the Riverside Caravan Park at 16 to 22 Short Street, Mudgee. This development application seeks to change the nature of the caravan park to providing wholly short term sites.
About 2 months ago
409 Parramatta Road Leichhardt 2040,411 Parramatta Road Leichhardt 2040,413 Parramatta Road Leichhardt 2040,415 Parramatta Road Leichhardt 2040, NSW
Partial demolition of existing structures and construction of a 7 storey mixed use building, including ground floor commercial space, 82 co-living units above, basement parking, and 5 lot amalgamation. Integrated development under Water Management Act 2000
About 2 months ago
112 Bells Lane Badagarang 2540,132 Bells Lane Badagarang 2540,50 Abernethys Lane Meroo Meadow 2540, NSW
Demolition of existing farm buildings within development footprint, retention of existing dwelling, earthworks, construction of a land lease community (multi dwelling housing) comprising 298 moveable dwellings, country club, recreational facilities, civil works (private roads and stormwater infrastructure).
About 2 months ago
815 Tocal Road Tocal 2421, NSW
Robotic Freestall Dairy Development
About 2 months ago
179 Calderwood Road Calderwood 2527, NSW
Embellishment And Civil Works For The Calderwood Urban Development Project (CUDP) ‘Sportsground S1’ And Seven Lot Torrens Title Subdivision
About 2 months ago
11 Duchatel Road Griffith 2680, NSW
Electricity Generating Works - 5mw distribution BESS & 7.1 MW Solar Farm
About 2 months ago
1 Elvin Drive Bomaderry 2541, NSW
Demolition of the existing facility and construction of a Medical Centre (Health Service Facility) including associated civil works.
About 2 months ago
25 Kangaroo Avenue Eastern Creek 2766, NSW
Section 4.55(2) Application MOD-25-00553 to modify Notice of Determination SPP-21-00007.
About 2 months ago
48 Beecroft Road Epping 2121,54 Beecroft Road Epping 2121,49 Beecroft Road Epping 2121,53 Beecroft Road Epping 2121,54 Rawson Street Epping 2121,52 Rawson Street Epping 2121, NSW
Section 4.55(2) modification to approved 21 storey mixed use development, including revisions to podium design and layout, tower façade, unit mix, basement and car parking.
About 2 months ago
873 Wallaces Gap Road Ballalaba 2622, NSW
Construction of a solar farm, battery energy storage systems, landscaping and associated site works
About 2 months ago
55A Well Street Ryde 2112, NSW
Section 4.56 to amend LDA2019/0149 to replace the approved Gabion Walls to the Podium Levels with a Fairview "Smart Bric"Brick Facade system
About 2 months ago
348 North Teven Road Teven 2478, NSW
Extension to existing extractive industry comprising: • Increase in vertical limit of extraction, within the existing extraction boundary, to extract approximately 1.4 million tonnes of hard rock resource • Ongoing extraction, processing, stockpiling and transportation of up to 500,000 tonnes of extractive material per year over up to seven years; • Rehabilitation of the extractive industry site
About 2 months ago
50 Pitt Avenue Shell Cove 2529, NSW
Residential Flat Building With 154 Units Across Five Storeys With One Level Of Basement Car Parking And Three Ground Floor Commercial Premises
2 months ago