With regard to this proposed development, it is noted that the Traffic Impact Assessment regards all access roads to the site as "below technical capacity" with an emphasis on access via The Avenue.
- However Stage 1, and possibly Stage 2, will be immediately serviced for home and road building purposes, and then local traffic, by the gravel surfaced Sutherland Avenue. Residents on this thoroughfare already suffer from dust inundation and noise due to local traffic which originates from at least six existing dwellings, some with multiple vehicles and including the Developer's, located on Spring Hill Lane and the east end of South Hill.
-Further, the 200 metre straight road section seems to encourage excess speed, past three driveways (11, 17 and 19), to and from the Old Gostwyck Road intersection.
- Development approval should only be given if the Developer and Council seal Sutherland Avenue AND install traffic calming devices to slow traffic.
This comment has been sent but has not yet been acknowledged by the email server of Armidale Regional Council. This can happen if our email system or Armidale Regional Council's email system or network has a temporary problem.
Please check back in an hour or so. If the status hasn't changed you can contact us to figure out what's going on.